Project Overview
The Tekflor at the Google Corporate Event Center in Mt. View CA. was a collaboration between ………………. of DES Architects and Bonnie Boden of Floor Seal Technology. DES originally furnished Floor Seal with a diagram of the proposed layout of the design and color shades. Floor Seal began creating large on floor mockups with different sized saw cuts, proposed aggregates, glass, and colors. The final design mockup was approved and signed off at the Floor Seal Technology facility. The total design process took place over 6 months.
The on site project was completed in 14 days with MirrorCrete cutting and polishing processes.
Utilized Products
Project Details
Type: Event Center
Client: Level 10 Construction
Architect: DES Architects
Location: Mt. View, CA
Surface Area: 13k SF