Project Overview
The Googleplex is the nerve center of the entire Google- Alphabet Corporate Campus. In 2019 Bonnie Boden of Floor Seal Technology in conjunction with Level Ten Builders and ERICA LEE DES Architects removed layers of the existing slab at the Big Table Corporate Dining Facility before placing 10,000 SF of TekFlor with Multiple stain patterns. The project took 1 year to complete with some of the most unusual designs ever conceived.
Utilized Products
Learn more about these products…
Project Details
Type: Corporate HQs
Client: Level 10 Builders
Architect: DES Architects
Location: Mountain View, CA
Surface Area: 10,000 SF